The Des Renford Leisure Centre project, designed by Brewster Hjorth Architects, undertaken by Icon Construction, involves the demolition of the existing entry building and the construction of a new two-story building linked to the existing aquatic center. The project incorporates environmentally sustainable design (ESD) initiatives, featuring passive solar design, natural lighting, energy-efficient fixtures and fittings, natural ventilation, and rainwater harvesting and recycling.